RH Torque Tube Area
Work begins on the Torque Tube area. First job is correction of a couple of previous repairs.
First the intermediate panel, which was left with a big chunk missing at the end of previous work. Lighter, I guess, but not ideal for structural integrity of this area....
Barry free-handed the repair panel in 18swg as usual. Will be welded in as part of the final assembly of the TT / inner sill area.
The other correction was to a repair below the torque tube, in the area of the ARB mount.
Doesn't look too bad:
But not so nice from the other side:
So out it comes, replaced by another hand-formed repair piece: