RH Sill
Making a start on the RH side now, beginning with the sill.
These photos show another example of the previous restoration work - a weld approx every 100mm. Barry tells me one every 20mm is about right. They had also left the freshly-opened seam as bare metal. At least it came off easily!
Barry fabricated a new sill flange to replace the battered old one. Same as the other side.